Key Projects : |
|
Lakshmi Gas Field - CB-OS/2 |
|
- Pre-NELP block CB-OS/2 was the first block in which a JV under a PSC made a commercial discovery that was brought into production within 18 months.
- Lakshmi and Gauri fields are located in shallow waters offshore Cambay Basin
- The fields produce approx 2.2 mmbtu of gas and approx 5000 bopd of condensate per day
- Gas is supplied to a Power project and other Industries based in Gujarat
- Petrodril Role:
- Carried out the initial assessment on CB-OS/2 for Command Petroleum
- Assisted Command Petroleum to form a JV with Tata’s and ONGC
- Developed a bid strategy
- Led the bid negotiations to ensure award to the consortium
- Assisted the JV in contract negotiations
- Statutory clearances for the operator
- Stake holder relations, Government clearances, JV relations
|
|
|
|
|