Key Projects :
Lakshmi Gas Field - CB-OS/2
  • Pre-NELP block CB-OS/2 was the first block in which a JV under a PSC made a commercial discovery that was brought into production within 18 months.
  • Lakshmi and Gauri fields are located in shallow waters offshore Cambay Basin
  • The fields produce approx 2.2 mmbtu of gas and approx 5000 bopd of condensate per day
  • Gas is supplied to a Power  project and other Industries based in Gujarat
  • Petrodril Role:
    • Carried out the initial assessment on CB-OS/2 for Command Petroleum
    • Assisted Command Petroleum to form a JV with Tata’s and ONGC
    • Developed a bid strategy
    • Led the bid negotiations to ensure award to the consortium
    • Assisted the JV in contract negotiations
    • Statutory clearances for the operator
    • Stake holder relations, Government clearances, JV relations